Concrete poured for floor and both outside run areas |
Kennel building before stucco and roof are complete |
View towards the front (south) looking at the area where
the water supply is |
Skylights are visible,
sheetrock installed |
Guillotine doors, 4 on each side, are placed |
Another view of the interior, chain link stalls have
been completed |
Outside view of front, after outside runs have been installed. |
Front door, a dutch door |
Another view of exterior-exercise areas have not been
erected yet. |
Shade-a-pup covering installed over outside runs |
Water heater and sink. Table will be installed
next to sink soon. |
Completed kennel, exercise areas have been erected on